• Contact Us
  • About
  • Advertise
  • Careers
Thursday, July 3, 2025
Kashmir Dot Com
  • Home
  • Kashmir
  • Jammu
  • World
  • Politics
  • Opinion
  • Business
  • Health
  • Contact Us
  • Login
No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • Politics
  • Opinion
  • Business
  • Health
  • Contact Us
No Result
View All Result
Kashmir Dot Com
No Result
View All Result
Home Opinion

Progressing J&K: J&K on a mission to become largest clean energy-producing UT

200 MW grid-tied rooftop solar power plants to be installed on residential buildings by JAKEDA under 'Solar City Mission'

Kashmir Dot Com by Kashmir Dot Com
July 27, 2022
0
J-K Govt orders verification of Service books of Employees

Representational Image

0
SHARES
7
VIEWS
Share on Facebook

A A Shah

J&K is on a mission to become one of the largest clean energy-producing UT in the country with an objective to reduce dependency on conventional sources of energy and enable J&K in attaining self-sufficiency in its energy needs.

J&K Government recognizes that renewable energy can also significantly increase J&K’s and the Nation’s energy security.

To achieve this milestone, the work is going on to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu to ensure that the electricity needs of the city are fully met from solar energy.

Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.

The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.

The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy is provided to the beneficiaries through the DBT mode.

An official said that these rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.

With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units, he added.

The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit UT of J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) targets of 10.5% as fixed by the Government of India.

The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.

The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.

J&K has a good potential for solar energy and the renewable energy capacity would help to bridge a part of its power requirement. Under the new budget in PM KUSUM Scheme, 375 Solar Water Pumps will be installed in 2022-23 providing electricity benefit to 47159 souls, direct agriculture benefit to 18750 souls, and indirect agriculture benefit to 160000 souls.

Notably, Prime Minister Narendra Modi inaugurated a 500-kilowatt solar power plant at Village Pali of Samba which will make it India’s first “carbon-neutral Panchayat.

ShareTweetSendSharePinShare
Previous Post

ECI organises Workshop on First Level Checking on EVM/ VVPAT for DEOs, DDEOs of Kashmir

Next Post

24-year-old youth dies of heart attack while playing cricket in Budgam

Related Posts

What Truly Constitutes Maturity: A Modern Perspective on Growth and Awareness

What Truly Constitutes Maturity: A Modern Perspective on Growth and Awareness

June 12, 2025
Empowering Mindsets: Catalyzing Societal Transformation through Entrepreneurship

Empowering Mindsets: Catalyzing Societal Transformation through Entrepreneurship

May 25, 2025

Pakistan’s Miscalculation: The Strategic And Emotional Fallout Of The Pahalgam Attack

May 2, 2025

The Silent Epidemic: Sexual Abuse Behind Closed Doors

April 15, 2025

Lost in Silence: The Women We Betrayed

April 11, 2025

Is Omar trying to run with the hare and hunt with the hounds?

April 4, 2025
Next Post
Carpenter dies after falling from rooftop of Masjid in Budgam

24-year-old youth dies of heart attack while playing cricket in Budgam

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

LATEST NEWS

ACB files chargesheet against then ZEO Tangdhar, others in misappropriation of scholarship funds

Cyber Cell recovers over 11 lakh rupees in online financial fraud cases in Kupwara

Div Com flags off first batch of SANJY pilgrims from Domail Baltal

Shivraj Chouhan, Omar Abdullah review Agri, Rural Development progress in J&K

CM flags off fleet of water tankers to strengthen drinking water supply in Kashmir

Omar Abdullah visits SKIMS to enquire about health of Mehbooba Mufti’s mother

‘Travel in designated convoys’: Kashmir police issue advisory for Amarnath Yatra pilgrims

Gold jumps Rs 450 to Rs 99,620 per 10 g; silver rallies Rs 1,000

J&K Govt Transfers Three JKAS Officers

5 Lakh Homeless People In J&K To Get Permanent Shelter: Union Minister Shivraj Singh Chouhan

ADVERTISEMENT

About Us

Kashmir Dot Com (KDC) is J&K's premier News Agency having a vast reach of audience.

Kashmir Dot Com is a News Agency based in Srinagar, J&K that offers syndicated multimedia news feed to plethora of news-bureaus in J&K and beyond. We also provide a range of facilities from foreign and domestic channels to package their reports in Jammu and Kashmir. We cover almost all areas of interest in J&K to viewers including news, entertainment, and life styles, bussiness, sports, human-interest features and social and developmental issues.

KDC can well and truly take pride in the legacy of it's work, and in it's contribution towards the building of a free and fair Press in Jammu and Kashmir.

Category

  • Business
  • Entertainment
  • Health
  • JAMMU
  • Kashmir
  • Lead
  • National
  • Opinion
  • Politics
  • Science
  • Sports
  • Tech
  • Uncategorized
  • World

Company Info

  • Contact Us
  • About
  • Advertise
  • Careers
  • Contact Us
  • About
  • Advertise
  • Careers

© 2020 KDC

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • Politics
  • Opinion
  • Business
  • Health
  • Contact Us

© 2020 KDC

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In