• Contact Us
  • About
  • Advertise
  • Careers
Tuesday, July 1, 2025
Kashmir Dot Com
  • Home
  • Kashmir
  • Jammu
  • World
  • Politics
  • Opinion
  • Business
  • Health
  • Contact Us
  • Login
No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • Politics
  • Opinion
  • Business
  • Health
  • Contact Us
No Result
View All Result
Kashmir Dot Com
No Result
View All Result
Home Kashmir

Progressing J&K: Govt. giving significant push to hydroelectric power generation across J&K

Projects of more than 6300 MW capacity in pipeline to make J&K power surplus

Kashmir Dot Com by Kashmir Dot Com
July 25, 2022
0
Govt. giving significant push to hydroelectric power generation across J&K

The Baglihar dam, also on the Chenab, in J&K. Credit:: ICIMOD

0
SHARES
16
VIEWS
Share on Facebook

SRINAGAR, JULY 25, KDC: The J&K government is giving a significant push to generation of hydroelectric power with projects of more than 6300 MW capacity in pipeline for making UT of J&K power surplus.

To improve the current power capacity substantially, J&K has initiated a large-scale capacity augmentation programme. In 70 years, J&K was able to harness only 3500 MW, and now generation capacity is set to be doubled in four years and tripled in seven years.

Since August 2019, 2451 MVA has been added to the total capacity as compared to the 8394 MVA capacity achieved in seven decades. J&K Government launched various initiatives to strengthen and improve power infrastructure in the UT which had remained dilapidated for the last several decades.

The decade-long overdue up-gradation of power infrastructure which was ignored by successive regimes is being done in a sustained manner. According to a senior official, the present administration is eliminating the legacy of delays and all the languishing projects hanging for long are being completed in a record time.

Prime Minister,  Narendra Modi during his recent visit to J&K laid the foundation stone of Ratle and Kwar Hydroelectric projects. The 850 MW Ratle Hydroelectric Project will be constructed on Chenab river in Kishtwar District at a cost of around Rs 5300 crore. The 540 MW Kwar Hydroelectric Project will also be built on the Chenab river in Kishtwar District at a cost of over Rs 4500 crore. Both the projects will help meet the power requirements of the region.

According to official figures 3100 MW of power projects worth Rs 22315 cr were revised, accelerated and Memorandum of understanding of 3284 MW of projects worth Rs 29600 cr were signed.

Pakal Dul Hydroelectric Project in Jammu & Kashmir cleared by cabinet for Rs 8,112.12 crore investment will help in reducing power shortage in the northern region.

“Investment of Rs 8,112.12 crore for construction of the (4×250 MW) Pakal Dul Hydroelectric Project has been approved,” an official said.

The project would help in reducing the power shortage in the Northern region and partly to utilize storage provisions of the Indus Water Treaty. It would also help in the socio-economic upliftment of remote areas of J&K.

Under a new scheme “Revamped Distribution Sector Scheme (RDSS), projects worth Rs. 11767 crore are approved to reduce AT&C losses and ensure 24×7 power availability.

In a historic move to realise the goal of making Jammu and Kashmir self-sufficient in power sector, Ratle Hydroelectric Power Corporation Limited (RHPCL) and Megha Engineering and Infrastructure Limited (MEIL)  inked a contract agreement for the turnkey execution of 850-MW Ratle hydel project within a stipulated timeframe.

J&K has undertaken large-scale capacity augmentation programme in the power sector resulting in a huge leap in power transmission and distribution capacity. The new power generation projects like Ratle, Pakal Dul, Kiru etc, will bridge a major gap in the UT’s electricity requirements.

Similarly, 540 MW Kwar project being built at a cost of Rs 4526 cr  would be completed by November 2026.

Notably, in a significant step towards boosting renewable energy projects in J&K, in the Union Budget 2022, an allocation of Rs. 476.44 crore has been made as grants towards equity for 800 MW Ratle Hydroelectric Project and Rs. 130 crore as grants towards equity for 624 MW Kiru Hydroelectric Project. It will boost energy transition and fight against climate change.

The distribution capacity is now 16754 MVA, while as in 2019 it was only 12745 MVA. The length of HT line is 45101 which was 41204 Ckms before 2019, while as length of LT line has increased from 79754  to 96017 Ckms from 2019 till date. (KDC)

ShareTweetSendSharePinShare
Previous Post

Tarun Chugh flags off Srinagar-Kargil bikers’ Tiranga rally

Next Post

This year aspirants from J&K will have arranged boarding, lodging in AMU; JKSA express gratitude

Related Posts

ACB traps junior engineer of Rural Development Department for accepting bribe

DDC Member, Tout Arrested by ACB for Demanding ₹5 Lakh Bribe for School NOCs

July 1, 2025
LG Sinha visits Baltal, reviews preparedness ahead of Shri Amarnath Ji Yatra

LG Sinha visits Baltal, reviews preparedness ahead of Shri Amarnath Ji Yatra

June 30, 2025

Reshuffle in J&K Anti-Corruption Bureau

June 30, 2025

6000 students participate in NMMSS examination

June 30, 2025

Committee on Petitions holds meeting in Srinagar

June 30, 2025

Srinagar Police Attaches Residential Property Worth Rs 50 Lakh

June 30, 2025
Next Post
This year aspirants from J&K will have arranged boarding, lodging in AMU; JKSA express gratitude

This year aspirants from J&K will have arranged boarding, lodging in AMU; JKSA express gratitude

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

LATEST NEWS

BMO Gool Under Probe for Harassment, Extortion, and Salary Withholding

19-Kg Commercial LPG Cylinder Price Slashed By ₹58.50, No Change In Domestic Cylinder Rates

Baramulla Breathes Football as Varmul Gindo 2025 Sparks a Turf Revolution

DDC Member, Tout Arrested by ACB for Demanding ₹5 Lakh Bribe for School NOCs

Indian stock market opens higher, Nifty above 25,500

We Do Not Fear Terrorists: Amarnath Pilgrims Opt For Pahalgam Route Despite Shadow Of April 22 Carnage

Railway Ministry Hikes Fares Of AC Classes By 2 Paise, Non-AC By 1 Paisa Per Km From July 1

ACB arrests Patwari for accepting bribe

LG Sinha visits Baltal, reviews preparedness ahead of Shri Amarnath Ji Yatra

Reshuffle in J&K Anti-Corruption Bureau

ADVERTISEMENT

About Us

Kashmir Dot Com (KDC) is J&K's premier News Agency having a vast reach of audience.

Kashmir Dot Com is a News Agency based in Srinagar, J&K that offers syndicated multimedia news feed to plethora of news-bureaus in J&K and beyond. We also provide a range of facilities from foreign and domestic channels to package their reports in Jammu and Kashmir. We cover almost all areas of interest in J&K to viewers including news, entertainment, and life styles, bussiness, sports, human-interest features and social and developmental issues.

KDC can well and truly take pride in the legacy of it's work, and in it's contribution towards the building of a free and fair Press in Jammu and Kashmir.

Category

  • Business
  • Entertainment
  • Health
  • JAMMU
  • Kashmir
  • Lead
  • National
  • Opinion
  • Politics
  • Science
  • Sports
  • Tech
  • Uncategorized
  • World

Company Info

  • Contact Us
  • About
  • Advertise
  • Careers
  • Contact Us
  • About
  • Advertise
  • Careers

© 2020 KDC

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • World
  • Politics
  • Opinion
  • Business
  • Health
  • Contact Us

© 2020 KDC

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In